Lobby, primary corridor and bathrooms
โ Completed February 2026ย
๐ View location
Before
After
Pictures are worth 1000 words, but they don't show it all. Not pictured is: the replacement of two double sockets that were cracked, purchase and installation of the missing water fountain piece so it's now back in service (and cleaning out the eye wateringly smelly waste trap!), repairing the fist sized hole in the door to the boy's toilet, sourcing and installing missing skirting, cleaning out crisp packets from the hallway heater, scrubbing very well adhered grime off the floor, and finally, the fact that the toilets no longer stink!
Now know as the funky toilet
๐ง Work in progress: the back of the toilet and the sink area still need to be tiled.
๐View location
Before
Work in progress
Not pictured: swapping this from 'gentlemen' to 'toilet', peeling off the man toilet sign, punching the protruding nail heads down flush to the wall, and reaffixing a fallen skirting tile.ย
๐ง Work in progress. Still to come: repair to the outer doors, replacement locks, some brighter colors on the walls.ย
๐View location
Before
Work in progress
Not pictured: the absolute filth coming up off the floor (didn't replace the floor, just cleaned it), scraping off the peeling paint, and the fact that this toilet no longer stinks!
AKA "bird toilet" because of the swallow nesting in there
๐ง Work in progress
๐View location
Before
Work in progress
Before
After
Not pictured: the 4 layers of paint that somehow didn't get through the rust on the radiator. Honorable mention to swapping the hand soap and the towel dispenser to avoid this issue in the future! Could use a deep clean of the floor, and replacement of all of the boxing around the sanitary ware as/when budget allows.ย
Before
After